NEPSEtrading

Make smarter moves backed by machine learning. Join thousands of traders leveraging AI to maximize profits.

nepsetrading.com is an online news portal that provides insights into trading and investment by analyzing the stock market and the global economy. We create charts based on the analysis of various indicators. Please do not rely solely on this information for investment decisions. Self-study is crucial. Use this information only as an educational and informational resource.

Marketminds Investment Group Private Limited

DOIB Registration certificate no.: 4680-2081/2082

Director & Editor-in-chief: Dipesh Ghimire · 9802363868, 9851119988

Koteshwor 32, Kathmandu
01-5253221 · +977 9709066745

Contact support

Subscribe to our newsletter

Weekly insights from the NEPSE market in your inbox.

Get the app

Track markets, signals and alerts from your phone.

Get it onGoogle Play

Market

  • Stocks
  • Sectors

Company

  • About Us
  • Our Team
  • Terms of Use
  • Our Policy
  • Training
  • Contact Us

Help

  • Support
  • Report
  • FAQ

© 2026 nepsetrading.com. All rights reserved.
Owned and operated by Marketminds Investment Group Private Limited.

Charts powered by TradingView

  1. News
  2. Investor
  3. Daramkhola Hydropower Begins Commercial Electricity Generation in Baglung
दरमखोला हाइड्रोपावरबाट व्यावसायिक उत्पादन सुरु, बागलुङमा सबैभन्दा ठूलो परियोजना सञ्चालनमा
Investor
1 min read
Published on November 18, 2025
NEPSE TRADING

दरमखोला हाइड्रोपावरबाट व्यावसायिक उत्पादन सुरु, बागलुङमा सबैभन्दा ठूलो परियोजना सञ्चालनमाDaramkhola Hydropower Begins Commercial Electricity Generation in Baglung

बागलुङ — करिब १७ वर्षअघि अनुमति लिएर निर्माण सुरु गर्न ढिला भएको दरमखोला हाइड्रोपावरले अखेर व्यावसायिक उत्पादन सुरु गरेको छ। विसं २०७७ देखि पुनः प्रारम्भ गरिएको निर्माणपछि आइतबारदेखि औपचारिक रूपमा विद्युत् उत्पादन सुरु गरिएको हो।

दरमखोला हाइड्रो इनर्जी लिमिटेडमार्फत सञ्चालित ९.६ मेगावाट क्षमताको सो हाइड्रोपावर गत असोज ३० गते नै केन्द्रीय प्रसारण लाइनमा जडान गरिएको थियो। प्रारम्भमा गोर्खा हाइड्रोपावर कम्पनीलाई जिम्मेवारी दिइएको परियोजना पछि रोकिएपछि नयाँ कम्पनीले काम निरन्तरता दिएको हो।

गलकोट नगरपालिका–८ काँडेबासस्थित ड्याम र मनेवापाटा क्षेत्रमा निर्माण गरिएको विद्युत्गृहबाट अहिले हिउँदे पानी प्रवाहका कारण ६.६ मेगावाट मात्रै उत्पादन भइरहेको इञ्जिनियर मिथिलेस चौधरीले जानकारी दिए। उनका अनुसार बर्खायाममा भने पूर्ण क्षमता ९.६ मेगावाटसम्म उत्पादन गर्न सकिनेछ।

Baglung — After years of delay and multiple setbacks, the Daramkhola Hydropower Project has finally begun commercial electricity generation. Although the project was originally approved 17 years ago, construction formally resumed only in 2077 BS, and commercial production started on Sunday.

Operated by Daramkhola Hydro Energy Limited, the 9.6-megawatt project was connected to the national grid on Ashoj 30. The project was initially assigned to Gorkha Hydropower Company, but after the company failed to move forward, a new company was formed to resume and complete the construction.

The dam has been built at Kandevas in Galkot Municipality-8, and the powerhouse is located about 4.5 kilometers west at Manevapata. According to engineer Mithilesh Chaudhary, the plant is currently generating 6.6 MW due to low water flow in the winter season, although the full capacity of 9.6 MW can be produced during the monsoon.

Trending News

  • Trending2 Jul, 2026

    नेप्सेको आजको चार्टले के भन्छ : सन्तुलनको धरातलमा उभिएको बजारNEPSE Forms Hammer at Weak Low: Technical Signals Hint at Possible Turnaround, But Confirmation Still Pending

    Read news
  • Trending2 Jul, 2026

    चीनको बेइजिङमा नेपाल लगानी सम्मेलन, २०० भन्दा बढी लगानीकर्ता सहभागी हुनेNepal Investment Conference Begins in Beijing, Over 200 Investors Expected

    Read news
  • Trending2 Jul, 2026

    सरकारको १०० दिनमा आर्थिक सुधारको सकारात्मक संकेत देखिएको दाबीGovernment Claims Early Economic Gains Amid Reform Drive

    Read news

Related News

  • NEPSE Forms Hammer at Weak Low: Technical Signals Hint at Possible Turnaround, But Confirmation Still Pending
    Investor

    3 min read

    नेप्सेको आजको चार्टले के भन्छ : सन्तुलनको धरातलमा उभिएको बजारNEPSE Forms Hammer at Weak Low: Technical Signals Hint at Possible Turnaround, But Confirmation Still Pending

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Nepal Investment Conference Begins in Beijing, Over 200 Investors Expected
    Top

    1 min read

    चीनको बेइजिङमा नेपाल लगानी सम्मेलन, २०० भन्दा बढी लगानीकर्ता सहभागी हुनेNepal Investment Conference Begins in Beijing, Over 200 Investors Expected

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Government Claims Early Economic Gains Amid Reform Drive
    Top

    2 min read

    सरकारको १०० दिनमा आर्थिक सुधारको सकारात्मक संकेत देखिएको दाबीGovernment Claims Early Economic Gains Amid Reform Drive

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Draft Company Law Amendment Proposes Stronger Investment Protection for Infrastructure Projects
    Investor

    1 min read

    कम्पनी ऐन संशोधन मस्यौदामा पूर्वाधार लगानीकर्तालाई नयाँ सुरक्षाDraft Company Law Amendment Proposes Stronger Investment Protection for Infrastructure Projects

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Foreign Exchange Rates: Dollar Selling Rate at Rs 151.76, Kuwaiti Dinar the Most Expensive
    Investor

    1 min read

    विदेशी मुद्रा विनिमय दर : डलरको बिक्री मूल्य १५१.७६ रुपैयाँ, कुवेती दिनार सबैभन्दा महँगोForeign Exchange Rates: Dollar Selling Rate at Rs 151.76, Kuwaiti Dinar the Most Expensive

    Dipesh Ghimire

    ·

    1 Jul, 2026