NEPSEtrading

Make smarter moves backed by machine learning. Join thousands of traders leveraging AI to maximize profits.

nepsetrading.com is an online news portal that provides insights into trading and investment by analyzing the stock market and the global economy. We create charts based on the analysis of various indicators. Please do not rely solely on this information for investment decisions. Self-study is crucial. Use this information only as an educational and informational resource.

Marketminds Investment Group Private Limited

DOIB Registration certificate no.: 4680-2081/2082

Director & Editor-in-chief: Dipesh Ghimire · 9802363868, 9851119988

Koteshwor 32, Kathmandu
01-5253221 · +977 9709066745

Contact support

Subscribe to our newsletter

Weekly insights from the NEPSE market in your inbox.

Get the app

Track markets, signals and alerts from your phone.

Get it onGoogle Play

Market

  • Stocks
  • Sectors

Company

  • About Us
  • Our Team
  • Terms of Use
  • Our Policy
  • Training
  • Contact Us

Help

  • Support
  • Report
  • FAQ

© 2026 nepsetrading.com. All rights reserved.
Owned and operated by Marketminds Investment Group Private Limited.

Charts powered by TradingView

  1. News
  2. Top
  3. Hewa Khola ‘A’ Hydropower Project Resumes Operation After Flood Disruption
हेवा खोला ‘ए’ जलविद्युत आयोजना बाढीपछि पुनः सञ्चालनमा
Top
1 min read
Published on October 9, 2025
NEPSE TRADING

हेवा खोला ‘ए’ जलविद्युत आयोजना बाढीपछि पुनः सञ्चालनमाHewa Khola ‘A’ Hydropower Project Resumes Operation After Flood Disruption

काठमाडौं — पाँचथर पावर कम्पनी लिमिटेडले संचालित हेवा खोला ‘ए’ जलविद्युत आयोजना बाढीका कारण बन्द भएपछि पुनः सञ्चालनमा आएको छ। कम्पनीले नेपाल धितोपत्र बोर्ड, नेपाल स्टक एक्सचेन्ज र सिडिएस एण्ड क्लियरिङ लिमिटेडलाई जानकारी दिँदै आयोजना सञ्चालन अब सामान्य अवस्थामा फर्किएको जनाएको छ।

कम्पनीका अनुसार, पाँचथर जिल्लास्थित १४.९ मेगावाट क्षमताको हेवा खोला ‘ए’ आयोजना मिति २०८२ असोज १८ गते राति करिब १२ बजे अविरल वर्षाका कारण आएको बाढीले प्रभावित बनेको थियो। बाढीका कारण प्लान्ट इर्मेर्जेन्सी रूपमा बन्द गर्नुपरेको र टेलरेस (Tailrace) क्षेत्रमा समस्या देखिएको कम्पनीले जनाएको छ।

तर, तत्काल मर्मत कार्य सम्पन्न गरेपछि आयोजना मिति २०८२ असोज २१ गते साँझ ४:११ बजे पुनः सञ्चालनमा आएको हो। कम्पनी सचिव सुन्दर मणि सुवेदीले जारी गरेको सूचनामा आयोजना पुनः सञ्चालनमा आएको जानकारी सम्बन्धित निकायहरूलाई औपचारिक रूपमा दिइएको उल्लेख छ।

हेवा खोला ‘ए’ आयोजना हाल पुनः बिजुली उत्पादन गर्दै राष्ट्रिय प्रसारण प्रणालीमा विद्युत आपूर्ति गरिरहेको कम्पनीले जनाएको छ।

Kathmandu — Panchthar Power Company Limited has announced that its Hewa Khola ‘A’ Hydropower Project has resumed full operation after being temporarily shut down due to flooding. The company informed the Securities Board of Nepal (SEBON), Nepal Stock Exchange (NEPSE), and CDS and Clearing Limited (CDSC) that the plant is now operating normally again.

According to the company, the 14.9 MW Hewa Khola ‘A’ Hydropower Project, located in Panchthar District, was forced to shut down on the night of Ashwin 18, 2082 (around midnight) after continuous rainfall caused severe flooding in the area. The flood damaged the tailrace section of the plant, leading to an emergency shutdown of operations.

After immediate repair and maintenance work, the plant resumed power generation on Ashwin 21, 2082 at 4:11 PM. The official notice, signed by Company Secretary Sundar Mani Subedi, confirmed that operations have returned to normal and the project is once again supplying electricity to the national grid.

The company has also communicated the update to relevant authorities, including the Department of Electricity Development and the Electricity Regulatory Commission, ensuring transparency regarding the incident and recovery.

Trending News

  • Trending2 Jul, 2026

    नेप्सेको आजको चार्टले के भन्छ : सन्तुलनको धरातलमा उभिएको बजारNEPSE Forms Hammer at Weak Low: Technical Signals Hint at Possible Turnaround, But Confirmation Still Pending

    Read news
  • Trending2 Jul, 2026

    चीनको बेइजिङमा नेपाल लगानी सम्मेलन, २०० भन्दा बढी लगानीकर्ता सहभागी हुनेNepal Investment Conference Begins in Beijing, Over 200 Investors Expected

    Read news
  • Trending2 Jul, 2026

    सरकारको १०० दिनमा आर्थिक सुधारको सकारात्मक संकेत देखिएको दाबीGovernment Claims Early Economic Gains Amid Reform Drive

    Read news

Related News

  • NEPSE Forms Hammer at Weak Low: Technical Signals Hint at Possible Turnaround, But Confirmation Still Pending
    Investor

    3 min read

    नेप्सेको आजको चार्टले के भन्छ : सन्तुलनको धरातलमा उभिएको बजारNEPSE Forms Hammer at Weak Low: Technical Signals Hint at Possible Turnaround, But Confirmation Still Pending

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Nepal Investment Conference Begins in Beijing, Over 200 Investors Expected
    Top

    1 min read

    चीनको बेइजिङमा नेपाल लगानी सम्मेलन, २०० भन्दा बढी लगानीकर्ता सहभागी हुनेNepal Investment Conference Begins in Beijing, Over 200 Investors Expected

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Government Claims Early Economic Gains Amid Reform Drive
    Top

    2 min read

    सरकारको १०० दिनमा आर्थिक सुधारको सकारात्मक संकेत देखिएको दाबीGovernment Claims Early Economic Gains Amid Reform Drive

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Draft Company Law Amendment Proposes Stronger Investment Protection for Infrastructure Projects
    Investor

    1 min read

    कम्पनी ऐन संशोधन मस्यौदामा पूर्वाधार लगानीकर्तालाई नयाँ सुरक्षाDraft Company Law Amendment Proposes Stronger Investment Protection for Infrastructure Projects

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Foreign Exchange Rates: Dollar Selling Rate at Rs 151.76, Kuwaiti Dinar the Most Expensive
    Investor

    1 min read

    विदेशी मुद्रा विनिमय दर : डलरको बिक्री मूल्य १५१.७६ रुपैयाँ, कुवेती दिनार सबैभन्दा महँगोForeign Exchange Rates: Dollar Selling Rate at Rs 151.76, Kuwaiti Dinar the Most Expensive

    Dipesh Ghimire

    ·

    1 Jul, 2026