सानिमा मिडल तमोर हाइड्रोपावरको चौथो त्रैमासिक वित्तीय विवरणSanima Middle Tamor Hydropower: Q4 Financial Report
- वर्ग:Category:
- Financial Analysis
- प्रकाशित मिति:Published:
- Published on August 12, 2026
Sanima Middle Tamor Hydropower Limited
Dhumbarahi, KMC-4, Kathmandu, Nepal
Unaudited Financial Reports (Quarterly)
As on 4th Quarter (2083.03.32) of the Fiscal Year 2082/083
FOURTH QUARTER DISCLOSURE AS OF 2083.03.32
AS PER SECURITIES REGISTRATION AND ISSUANCE REGULATION
ANNEXURE-14 (RELATED TO SUB REGULATION 1 OF REGULATION 26)
STATEMENT OF FINANCIAL POSITION
Unaudited This Quarter Ending As on 32.03.2083 Unaudited Previous Quarter Ending As on 30.12.2082 Audited Corresponding Previous Year Quarter Ending As on 32.03.2082
| Assets | |||
| Non-Current Assets | |||
| Property Plant & Equipment | 58,408,631 | 60,879,900 | 61,651,016 |
| Intangible Assets | 12,734,349,705 | 12,861,284,823 | 13,186,825,922 |
| Investment in Associates | 57,750,000 | - | - |
| ROU Assets | 9,428,533 | 9,686,976 | 10,462,303 |
| Current Assets | |||
| Inventories | 146,517,647 | 87,382,324 | 21,051,782 |
| Cash and cash equivalents | 207,015,471 | 281,276,107 | 123,438,669 |
| Other Financial Assets | 1,066,749,400 | 714,464,523 | 615,731,054 |
| Other Current Assets | 54,449,522 | 36,381,245 | 195556074 |
| Current tax assets | 4,688,071 | 4,664,828 | 4,462,646 |
| Total Assets | 14,339,356,979 | 14,056,020,725 | 14,219,179,466 |
| Liabilities | |||
| Non-Current Liabilities | |||
| Borrowings (Long Term Loan) | 8,655,533,549 | 9,287,138,349 | 9,281,658,349 |
| Other Financial Liabilities ( Retention) | 156,800,300 | 156,719,176 | 156,639,388 |
| Provisions | 1,222,523 | 1,624,381 | 1,762,470 |
| Lease Liability | 10,403,924 | 10,874,621 | 10,874,621 |
| Current Liabilities | |||
| Current Borrowings | 634,324,800 | 46,659,200 | 374,360,000 |
| Other Financial Liabilities | 573,636,549 | 624,616,796 | 720,896,185 |
| Other Current Liabilities | 13,607,916 | 6,929,896 | 2,252,468 |
| Lease Current Liabilities | 470,697 | 70,926 | 364,962 |
| Total Liabilities | 10,046,000,258 | 10,134,633,345 | 10,548,808,443 |
| Equity | |||
| Share Capital | 3,332,500,000 | 3,332,500,000 | 3,332,500,000 |
| Less Calls In Arrears | (3,000) | (3,000) | (3,000) |
| Net Share Capital | 3,332,497,000 | 3,332,497,000 | 3,332,497,000 |
| Retained Earnings | 955,130,940 | 584,596,434 | 333,580,077 |
| Other Reserves | 5,728,781 | 4,293,946 | 4,293,946 |
| Total Equity | 4,293,356,721 | 3,921,387,380 | 3,670,371,023 |
| Total Liabilities and Equity | 14,339,356,979 | 14,056,020,725 | 14,219,179,466 |
Statement of Profit or Loss
Unaudited This Quarter Ending 2082.04.01 to 2083.03.32 Unaudited Previous Quarter Ending 2082.04.01 to 2082.12.30 Audited Corresponding Previous Year Quarter Ending 2081.04.01 to 2082.03.32
| Revenue (Construction) | 27,576,343 | 25,598,828 | 661,492,448 |
| Cost of Sales (Construction) | (27,576,343) | (25,598,828) | (661,492,448) |
| Revenue From Sale of Electricity | 2,025,176,096 | 1,311,728,599 | 1,972,586,276 |
| Plant operating expenses | (252,416,200) | (177,197,066) | (261,297,007) |
| Gross profit | 1,772,759,896 | 1,134,531,533 | 1,711,289,269 |
| Other Income | 31,166,351 | 76,632 | 544,136 |
| Administration Expenses | (41,589,444) | (29,446,366) | (40,926,956) |
| Amortization and Depreciation | (484,655,359) | (360,935,466) | (469,092,353) |
| Net operating profit/(Loss) | 1,277,681,444 | 744,226,334 | 1,201,814,096 |
| Financial costs | (602,854,429) | (462,969,066) | (778,070,349) |
| Financial income | 4,448,687 | 3,419,568 | 3,634,034 |
| Foreign exchange gain/(loss) | (42,195,891) | (28,529,309) | (9,679,142) |
| Profit/(Loss) before tax & bonus | 637,079,811 | 256,147,527 | 417,698,639 |
| Provision for Staff Bonus | (12,741,596) | (5,122,951) | (8,353,973) |
| Profit/(Loss) before tax | 624,338,215 | 251,024,576 | 409,344,666 |
| Income Tax Provision | (46,849) | (8,219) | - |
Deferred Tax Income/(Expense)
Net Profit/(Loss) 624,291,365 251,016,357 409,344,666
Major Financial Highlights
Period As on 32.03.2083 As on 30.12.2082 As on 32.03.2082
| Earnings Per Share (EPS) | 18.73 | 7.53 | 12.28 |
| Current Ratio (CR) | 1.21 | 1.66 | 0.87 |
| Net Worth Per Share | 128.83 | 117.67 | 110.14 |
| Return on Assets (ROA) | 4.36 | 1.79 | 2.88 |
| Market Value Per Share | 437.00 | 454.00 | 517.53 |
| P/E Ratio | 23.33 | 60.27 | 42.14 |
Financial Statements
. The Unaudited financial statements for the fourth quarter have been published as a part of this report.
. The Construction Revenue and Construction Cost for the reporting period as per IFRIC-12 is NPR. 27,576,343 /-
. Service concession arrangement of Sanima Middle Tamor Hydropower Limited (SMTHL) includes operating Middle Tamor Hydropower Project (MTHP - 73 MW). Service Concession arrangements are amortized over the contractual period of the project which is up to 2110/02/21 B.S. The total Intangible Assets net of amortization as on 32nd Asar 2083 is NPR. 12,734,349,705 /-
. Previous quarter figures has been rearranged and regrouped whenever necessary.
Management Analysis
. The Company has incurred NPR. 41,589,444/- as administrative expenses during the reporting period and NPR. 484,655,359/-as amortization of project assets and depreciation of fixed assets. The Company has generated an amount of NPR. 2,025,176,096 as a sale of electricity and incurred NPR. 252,416,200 as plant operating expenses during this period. Among such expenses NPR. 40,503,521 is Generation Royalty expense, NPR. 37,626,104 is Plant Insurance expense, NPR. 7,728,575 is Consultancy expenses NPR. 61,963,573 is Repair & Maintenance, NPR. 51,694,577 as Plant Operating Staff Cost and remaining expense includes administrative and office operating expenses of site which amounts to NPR. 52,899,846
. Other income mainly comprises insurance compensation of NPR. 30,603,500 received towards loss of profit arising from the interruption of power generation. The damage resulted in the temporary shutdown of the generating unit, causing loss of generation and corresponding loss of profit to the company.
. The Company has earned NPR. 4,448,687 as financial income during the reporting period
. The Company has invested NPR. 57,750,000 in the Tamor Vyoma Hydro Private Limited. Tamor Vyoma Hydro Pvt. Ltd. is a hydropower development company engaged in the development of hydropower projects in Nepal. The Company has obtained a survey license for the Solu Dudhkoshi IV Hydropower Project (Q45-47 MW), and is undertaking activities related to the survey and development of the project.
Legal Proceedings
. During the reporting period, no legal cases were raised or pending against the Company and from the Company.
Analysis of Company's Share Transaction
. The major highlights of Share transactions during the reporting period are as follows:
| Particulars 4th Quarter Ending | 2082.83 | 2082.83 | 2081.82 |
| Maximum price NPR. | 508.20 | 475.00 | 517 |
| Minimum price NPR. | 422.80 | 396.40 | 481.2 |
| Closing price NPR. | 437.00 | 454.00 | 517.53 |
| Total Turnover NPR. | 1,429,506,372.40 | 2,205,428,921.80 | 964,042,868.80 |
| Total Transactions | 13,859 | 20,554 | 15,401 |
| No. of transaction Day | 64 | 53 | 63 |
| Total traded volume (No.) | 3,172,465 | 4,935,527 | 1,847,590 |
Problems & Challenges
Internal Challenges
. Finding skilled human resources in required number and their retention.
. Availability of suitable modern equipment in domestic market for effective operation maintenance.
External Challenges
. Devaluation of local currency against USD.
. Interest rate may impact the profitability.
. Problem to get appropriate insurances policies for hydroelectric projects in Nepal.
. Natural disaster such as flood, earthquake, landslides, etc.
. Climatic changes resulting extreme hydrological fluctuations.
. Geological risks.
. Challenges to evacuate full generation due to load dispatch instruction and outages of NEA transmission system.
Strategies
. Mobilize available resources for effective operation and maintenance of the plant to maximize the generation.
. Effective fund management as per the project investment plan.
. Adequate insurance policies against potential losses due to natural disasters and normal business risks.
. Proper strategies and planning for effective operation and maintenance of the power plant.
Corporate Governance
The Board of Directors, Audit Committee, other Committees, and Management Team are committed to strengthening good corporate governance within the Company. SMTHL has written manuals, policies, rules & guidelines for the proper operation of the Company.
Declaration
I, the General Manager of this Company, take the responsibility for the accuracy of the information and details mentioned in this report for the period up to the fourth quarter of F.Y 2082/083. I hereby declare that the information and details provided in this report are true, based on facts, and complete to the best of my knowledge and that any information necessary for taking informed decision by the investors are not concealed.
Please contact at 01-4372828/4373030 for any further inquiry about the Company.
Sanima Middle Tamor Hydropower Limited
Dhumbarahi, KMC-4, Kathmandu, Nepal
Unaudited Financial Reports (Quarterly)
As on 4th Quarter (2083.03.32) of the Fiscal Year 2082/083
FOURTH QUARTER DISCLOSURE AS OF 2083.03.32
AS PER SECURITIES REGISTRATION AND ISSUANCE REGULATION
ANNEXURE-14 (RELATED TO SUB REGULATION 1 OF REGULATION 26)
STATEMENT OF FINANCIAL POSITION
Unaudited This Quarter Ending As on 32.03.2083 Unaudited Previous Quarter Ending As on 30.12.2082 Audited Corresponding Previous Year Quarter Ending As on 32.03.2082
| Assets | |||
| Non-Current Assets | |||
| Property Plant & Equipment | 58,408,631 | 60,879,900 | 61,651,016 |
| Intangible Assets | 12,734,349,705 | 12,861,284,823 | 13,186,825,922 |
| Investment in Associates | 57,750,000 | - | - |
| ROU Assets | 9,428,533 | 9,686,976 | 10,462,303 |
| Current Assets | |||
| Inventories | 146,517,647 | 87,382,324 | 21,051,782 |
| Cash and cash equivalents | 207,015,471 | 281,276,107 | 123,438,669 |
| Other Financial Assets | 1,066,749,400 | 714,464,523 | 615,731,054 |
| Other Current Assets | 54,449,522 | 36,381,245 | 195556074 |
| Current tax assets | 4,688,071 | 4,664,828 | 4,462,646 |
| Total Assets | 14,339,356,979 | 14,056,020,725 | 14,219,179,466 |
| Liabilities | |||
| Non-Current Liabilities | |||
| Borrowings (Long Term Loan) | 8,655,533,549 | 9,287,138,349 | 9,281,658,349 |
| Other Financial Liabilities ( Retention) | 156,800,300 | 156,719,176 | 156,639,388 |
| Provisions | 1,222,523 | 1,624,381 | 1,762,470 |
| Lease Liability | 10,403,924 | 10,874,621 | 10,874,621 |
| Current Liabilities | |||
| Current Borrowings | 634,324,800 | 46,659,200 | 374,360,000 |
| Other Financial Liabilities | 573,636,549 | 624,616,796 | 720,896,185 |
| Other Current Liabilities | 13,607,916 | 6,929,896 | 2,252,468 |
| Lease Current Liabilities | 470,697 | 70,926 | 364,962 |
| Total Liabilities | 10,046,000,258 | 10,134,633,345 | 10,548,808,443 |
| Equity | |||
| Share Capital | 3,332,500,000 | 3,332,500,000 | 3,332,500,000 |
| Less Calls In Arrears | (3,000) | (3,000) | (3,000) |
| Net Share Capital | 3,332,497,000 | 3,332,497,000 | 3,332,497,000 |
| Retained Earnings | 955,130,940 | 584,596,434 | 333,580,077 |
| Other Reserves | 5,728,781 | 4,293,946 | 4,293,946 |
| Total Equity | 4,293,356,721 | 3,921,387,380 | 3,670,371,023 |
| Total Liabilities and Equity | 14,339,356,979 | 14,056,020,725 | 14,219,179,466 |
Statement of Profit or Loss
Unaudited This Quarter Ending 2082.04.01 to 2083.03.32 Unaudited Previous Quarter Ending 2082.04.01 to 2082.12.30 Audited Corresponding Previous Year Quarter Ending 2081.04.01 to 2082.03.32
| Revenue (Construction) | 27,576,343 | 25,598,828 | 661,492,448 |
| Cost of Sales (Construction) | (27,576,343) | (25,598,828) | (661,492,448) |
| Revenue From Sale of Electricity | 2,025,176,096 | 1,311,728,599 | 1,972,586,276 |
| Plant operating expenses | (252,416,200) | (177,197,066) | (261,297,007) |
| Gross profit | 1,772,759,896 | 1,134,531,533 | 1,711,289,269 |
| Other Income | 31,166,351 | 76,632 | 544,136 |
| Administration Expenses | (41,589,444) | (29,446,366) | (40,926,956) |
| Amortization and Depreciation | (484,655,359) | (360,935,466) | (469,092,353) |
| Net operating profit/(Loss) | 1,277,681,444 | 744,226,334 | 1,201,814,096 |
| Financial costs | (602,854,429) | (462,969,066) | (778,070,349) |
| Financial income | 4,448,687 | 3,419,568 | 3,634,034 |
| Foreign exchange gain/(loss) | (42,195,891) | (28,529,309) | (9,679,142) |
| Profit/(Loss) before tax & bonus | 637,079,811 | 256,147,527 | 417,698,639 |
| Provision for Staff Bonus | (12,741,596) | (5,122,951) | (8,353,973) |
| Profit/(Loss) before tax | 624,338,215 | 251,024,576 | 409,344,666 |
| Income Tax Provision | (46,849) | (8,219) | - |
Deferred Tax Income/(Expense)
Net Profit/(Loss) 624,291,365 251,016,357 409,344,666
Major Financial Highlights
Period As on 32.03.2083 As on 30.12.2082 As on 32.03.2082
| Earnings Per Share (EPS) | 18.73 | 7.53 | 12.28 |
| Current Ratio (CR) | 1.21 | 1.66 | 0.87 |
| Net Worth Per Share | 128.83 | 117.67 | 110.14 |
| Return on Assets (ROA) | 4.36 | 1.79 | 2.88 |
| Market Value Per Share | 437.00 | 454.00 | 517.53 |
| P/E Ratio | 23.33 | 60.27 | 42.14 |
Financial Statements
. The Unaudited financial statements for the fourth quarter have been published as a part of this report.
. The Construction Revenue and Construction Cost for the reporting period as per IFRIC-12 is NPR. 27,576,343 /-
. Service concession arrangement of Sanima Middle Tamor Hydropower Limited (SMTHL) includes operating Middle Tamor Hydropower Project (MTHP - 73 MW). Service Concession arrangements are amortized over the contractual period of the project which is up to 2110/02/21 B.S. The total Intangible Assets net of amortization as on 32nd Asar 2083 is NPR. 12,734,349,705 /-
. Previous quarter figures has been rearranged and regrouped whenever necessary.
Management Analysis
. The Company has incurred NPR. 41,589,444/- as administrative expenses during the reporting period and NPR. 484,655,359/-as amortization of project assets and depreciation of fixed assets. The Company has generated an amount of NPR. 2,025,176,096 as a sale of electricity and incurred NPR. 252,416,200 as plant operating expenses during this period. Among such expenses NPR. 40,503,521 is Generation Royalty expense, NPR. 37,626,104 is Plant Insurance expense, NPR. 7,728,575 is Consultancy expenses NPR. 61,963,573 is Repair & Maintenance, NPR. 51,694,577 as Plant Operating Staff Cost and remaining expense includes administrative and office operating expenses of site which amounts to NPR. 52,899,846
. Other income mainly comprises insurance compensation of NPR. 30,603,500 received towards loss of profit arising from the interruption of power generation. The damage resulted in the temporary shutdown of the generating unit, causing loss of generation and corresponding loss of profit to the company.
. The Company has earned NPR. 4,448,687 as financial income during the reporting period
. The Company has invested NPR. 57,750,000 in the Tamor Vyoma Hydro Private Limited. Tamor Vyoma Hydro Pvt. Ltd. is a hydropower development company engaged in the development of hydropower projects in Nepal. The Company has obtained a survey license for the Solu Dudhkoshi IV Hydropower Project (Q45-47 MW), and is undertaking activities related to the survey and development of the project.
Legal Proceedings
. During the reporting period, no legal cases were raised or pending against the Company and from the Company.
Analysis of Company's Share Transaction
. The major highlights of Share transactions during the reporting period are as follows:
| Particulars 4th Quarter Ending | 2082.83 | 2082.83 | 2081.82 |
| Maximum price NPR. | 508.20 | 475.00 | 517 |
| Minimum price NPR. | 422.80 | 396.40 | 481.2 |
| Closing price NPR. | 437.00 | 454.00 | 517.53 |
| Total Turnover NPR. | 1,429,506,372.40 | 2,205,428,921.80 | 964,042,868.80 |
| Total Transactions | 13,859 | 20,554 | 15,401 |
| No. of transaction Day | 64 | 53 | 63 |
| Total traded volume (No.) | 3,172,465 | 4,935,527 | 1,847,590 |
Problems & Challenges
Internal Challenges
. Finding skilled human resources in required number and their retention.
. Availability of suitable modern equipment in domestic market for effective operation maintenance.
External Challenges
. Devaluation of local currency against USD.
. Interest rate may impact the profitability.
. Problem to get appropriate insurances policies for hydroelectric projects in Nepal.
. Natural disaster such as flood, earthquake, landslides, etc.
. Climatic changes resulting extreme hydrological fluctuations.
. Geological risks.
. Challenges to evacuate full generation due to load dispatch instruction and outages of NEA transmission system.
Strategies
. Mobilize available resources for effective operation and maintenance of the plant to maximize the generation.
. Effective fund management as per the project investment plan.
. Adequate insurance policies against potential losses due to natural disasters and normal business risks.
. Proper strategies and planning for effective operation and maintenance of the power plant.
Corporate Governance
The Board of Directors, Audit Committee, other Committees, and Management Team are committed to strengthening good corporate governance within the Company. SMTHL has written manuals, policies, rules & guidelines for the proper operation of the Company.
Declaration
I, the General Manager of this Company, take the responsibility for the accuracy of the information and details mentioned in this report for the period up to the fourth quarter of F.Y 2082/083. I hereby declare that the information and details provided in this report are true, based on facts, and complete to the best of my knowledge and that any information necessary for taking informed decision by the investors are not concealed.
Please contact at 01-4372828/4373030 for any further inquiry about the Company.