NEPSEtrading

Make smarter moves backed by machine learning. Join thousands of traders leveraging AI to maximize profits.

nepsetrading.com is an online news portal that provides insights into trading and investment by analyzing the stock market and the global economy. We create charts based on the analysis of various indicators. Please do not rely solely on this information for investment decisions. Self-study is crucial. Use this information only as an educational and informational resource.

Marketminds Investment Group Private Limited

DOIB Registration certificate no.: 4680-2081/2082

Director & Editor-in-chief: Dipesh Ghimire · 9802363868, 9851119988

Koteshwor 32, Kathmandu
01-5253221 · +977 9709066745

Contact support

Subscribe to our newsletter

Weekly insights from the NEPSE market in your inbox.

Get the app

Track markets, signals and alerts from your phone.

Get it onGoogle Play

Market

  • Stocks
  • Sectors

Company

  • About Us
  • Our Team
  • Terms of Use
  • Our Policy
  • Training
  • Contact Us

Help

  • Support
  • Report
  • FAQ

© 2026 nepsetrading.com. All rights reserved.
Owned and operated by Marketminds Investment Group Private Limited.

Charts powered by TradingView

  1. News
  2. Stock
  3. Nepal Taps Remit-Power: NRNs to Invest in 1063 MW Upper Arun Project!
विदेशी नेपालीकाे लगानीमा 1063 MW अपर अरुण: सरकारकाे नयाँ ‘रेमिट–पावर’ प्लान!
Stock
1 min read
Published on November 25, 2025
NEPSE TRADING

विदेशी नेपालीकाे लगानीमा 1063 MW अपर अरुण: सरकारकाे नयाँ ‘रेमिट–पावर’ प्लान!Nepal Taps Remit-Power: NRNs to Invest in 1063 MW Upper Arun Project!

सरकारले १,०६३ मेगावाट क्षमताको अपर अरुण जलविद्युत् आयोजना विदेशी नेपालीकाे लगानीमा निर्माण गर्ने तयारी अघि बढाएको छ। ऊर्जा तथा जलस्रोत मन्त्री कुलमान घिसिङका अनुसार विदेशमा बस्ने नेपालीलाई शेयर उपलब्ध गराई ‘रेमिट–पावर मोडल’ मार्फत पूँजी उठाउने तयारी अन्तिम चरणमा पुगेको छ।

घिसिङले भने, “देश–विदेशका नेपालीको लगानीमा आयोजना बनाउने हाम्रो लक्ष्य हो।” परियोजनाले स्वदेशी लगानी, दातृ निकायको सहुलियतपूर्ण ऋण र विदेशी रेमिट्यान्समार्फत शेयर बिक्री गरी आवश्यक पूँजी जुटाउनेछ।

करिब २ खर्ब ३० अर्ब रुपैयाँ लागत अनुमान गरिएको आयोजना अन्तर्राष्ट्रिय फाइनान्सिङ क्लोजर नजिकिँदैछ। जग्गा प्राप्ति र वातावरणीय प्रभाव मूल्यांकन (EIA) सहितका काम पूरा भइसकेका छन्। संखुवासभामा बन्ने परियोजना ६ वर्षभित्र सम्पन्न गर्ने लक्ष्य राखिएको छ।

Nepal is set to build the 1,063 MW Upper Arun Hydropower Project through investments collected from Nepalis living abroad, marking a bold “Remit-Power Financing Model.”

Energy Minister Kulman Ghising said that the government plans to offer shares to Non-Resident Nepalis (NRNs) and migrant workers who regularly send remittances to Nepal. “We aim to build this project with the investment of Nepalis worldwide,” he said.

The financing modality has reached its final stage, with the project moving toward financial closure soon. The estimated cost is Rs 230 billion, to be raised through domestic investment, concessional loans, and share offerings to Nepalis abroad.

Located in Sankhuwasabha, the project has completed land acquisition and EIA works, with a completion target of within six years once construction begins.

Trending News

  • Trending2 Jul, 2026

    नेप्सेको आजको चार्टले के भन्छ : सन्तुलनको धरातलमा उभिएको बजारNEPSE Forms Hammer at Weak Low: Technical Signals Hint at Possible Turnaround, But Confirmation Still Pending

    Read news
  • Trending2 Jul, 2026

    चीनको बेइजिङमा नेपाल लगानी सम्मेलन, २०० भन्दा बढी लगानीकर्ता सहभागी हुनेNepal Investment Conference Begins in Beijing, Over 200 Investors Expected

    Read news
  • Trending2 Jul, 2026

    सरकारको १०० दिनमा आर्थिक सुधारको सकारात्मक संकेत देखिएको दाबीGovernment Claims Early Economic Gains Amid Reform Drive

    Read news

Related News

  • NEPSE Forms Hammer at Weak Low: Technical Signals Hint at Possible Turnaround, But Confirmation Still Pending
    Investor

    3 min read

    नेप्सेको आजको चार्टले के भन्छ : सन्तुलनको धरातलमा उभिएको बजारNEPSE Forms Hammer at Weak Low: Technical Signals Hint at Possible Turnaround, But Confirmation Still Pending

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Nepal Investment Conference Begins in Beijing, Over 200 Investors Expected
    Top

    1 min read

    चीनको बेइजिङमा नेपाल लगानी सम्मेलन, २०० भन्दा बढी लगानीकर्ता सहभागी हुनेNepal Investment Conference Begins in Beijing, Over 200 Investors Expected

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Government Claims Early Economic Gains Amid Reform Drive
    Top

    2 min read

    सरकारको १०० दिनमा आर्थिक सुधारको सकारात्मक संकेत देखिएको दाबीGovernment Claims Early Economic Gains Amid Reform Drive

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Draft Company Law Amendment Proposes Stronger Investment Protection for Infrastructure Projects
    Investor

    1 min read

    कम्पनी ऐन संशोधन मस्यौदामा पूर्वाधार लगानीकर्तालाई नयाँ सुरक्षाDraft Company Law Amendment Proposes Stronger Investment Protection for Infrastructure Projects

    NEPSE TRADING

    ·

    2 Jul, 2026

  • Foreign Exchange Rates: Dollar Selling Rate at Rs 151.76, Kuwaiti Dinar the Most Expensive
    Investor

    1 min read

    विदेशी मुद्रा विनिमय दर : डलरको बिक्री मूल्य १५१.७६ रुपैयाँ, कुवेती दिनार सबैभन्दा महँगोForeign Exchange Rates: Dollar Selling Rate at Rs 151.76, Kuwaiti Dinar the Most Expensive

    Dipesh Ghimire

    ·

    1 Jul, 2026